|
|
Machine Working setting |
|
Oil or Gas + Power |
Voltage |
|
220V |
Oil Use (lit/hour) |
|
Typical 13.3 lit/hour/chamber |
Gas consumption (NG) (m3/hour) |
|
16.0 (m3/hour) (NG) |
Gas intake (LPG) (m3/hour) |
|
11.7 (m3/hour) (LPG) |
Burning rate |
|
Regular 30kg/hour |
Feed setting |
|
Hand-operated |
Key Combustion chamber |
|
360 Liters |
Second Burning chamber |
|
200 Liters |
Combustion Chamber Product |
|
Refractory Concrete Cement+ firebrick |
Interior Measurements |
|
Yes (Main chamber) |
External measurements |
|
210x120x210cm( without smokeshaft) |
Door opening |
|
48X60 centimeters |
Fuel Kind |
|
Diesel Oil/ Gas/ LPG |
Burner |
|
Initial |
Smokeshaft size |
|
13.0 Meters |
Smoke filter chamber |
|
Yes |
Temperature monitor |
|
Two number Digital Show |
Temperature level protection |
|
Yes |
Oil container |
|
200L |
Burning Performance |
|
>> 98 Percent |
Chimney type |
|
Stainless-steel |
1st. |
|
800c– 1000c |
second. Chamber temperature level |
|
1000c– 1200c |
Residency time |
|
2.0 sec. |
Gross weight |
|
4000kg |
Electric Plastic as well as eyeglasses Shredder |
|
Yes |
Scrubber |
|
Yes |
Service Warranty Period |
|
1. Year |
Main combustion chamber |
|
Yes |
Secondary burning chamber |
|
Yes |
Incinerator control situation |
|
S. steel |
Incinerator chimney |
|
Initial |
Gas Heater |
|
Yes |
Oil Storage tank ability |
|
Yes |
Oil Stand assistance |
|
Yes |
Dry Smoke Filter Chamber |
|
Yes |
Air Follower |
|
Yes |
Overall waste incineration capacity/time |
Minimum 60KG
for Ministry of Public Wellness, Kabul, Afghanistan
Tel: +86-25-8461 0201
Website: www.clover-medical.com
Email: [email protected]
Email: [email protected]


